PROCEDURES

STEP 01

Sign up or Login in
the Exhibitor Portal

STEP 02

Fill out the Online application
※ Apply for booths and additional facilities.

STEP 03

Receive approval and an invoice
from the secretariat

STEP 04

Make a down payment
(50% of the total amount)
※ Within 7 days of application

STEP 05

Balance Payment
and Participation

BOOTH TYPE

CategoryRaw SpaceShell-Scheme Booth
Type
Price
(VAT Excluded)
USD 4,000USD 4,500
InclusionsSpace only
(1 booth base length 3m * width 3m)
Provides booth area (1 booth base length 3m * width 3m)
+ wall, inter-sign, non-combustible carpet,
electric wiring works, one socket outlet (220v),
3 lights (per booth), info desk, and1 set of chairs
(per company)
Specification
(Per Booth)
9㎡ (3m×3m)9㎡ (3m×3m×2.5m)

BOOTH DEATAILS

#01 Raw Space

Exhibitors may design their booths through the official contractor.
Contractor selection may be subject to internal regulations, and the selected contractor’s information (including contact details) must be submitted to the organizer.

Price USD 4,000 (Per Booth, VAT Excluded)
Inclusions Only the exhibition space corresponding to the number of booths applied for is provided (1 booth = 3m x 3m).

#02 Shell-Scheme Booth

The booth type constructed by the organizer

Price USD 4,000  (Per booth, VAT Excluded)
Inclusions The exhibition space corresponding to the number of booths applied (1 booth = 3m x 3m)
Booth wall, 3 spot lights, 220V outlet, carpet, information desk, waste bin, round table, and 3 chairs

ADDIONAL FACILITILES

Additional Facilities [VAT Excluded]

Classification
Price
Unit
Internet
USD 200
EA
Water & Drainage
USD 300
EA
Compressed Air
USD 300
EA
Visitor's badge bar-cod reader
USD 200
EA
  • Visitor’s badge bar-code Reader It scans bar-code printed on the visitor’s badge.
    – The bar-code contains visitor’s information.
    – Information data will be available within 1~2 weeks at the end of the exhibition.
    – Included Information: Name, Position, Contact number, E-mail, and survey response (This may include missing information, misplaced information)

Electricity [VAT Excluded]

ClassificationPriceUnit
Single-Phase(220V), Three-Phase(380V) Electricity
USD 100
kW
24 Hour Supply ElectricityUSD 150kW
Rigging Electricity
USD 300Per Application
  • Raw Space: Must apply for electricity as much as necessary
  • Standard Booth: Fundamental electricity for lighting provided, additional electricity must be applied

PAYMENT REGULATION

Payment Deadline

ClassificationPriceDeadline
Deposit50% of Total PaymentWithin a weeks after application submitted
BalanceRest PaymentBy June 27, 2025
  • Your application is confirmed after the deposit is paid, and booths are assigned after the balance is settled.

INQUIRY

Data Center Korea Organizer OfficeT. +82-2-6121-6451E. dckorea@esgroup.net